Product Case Studies – Gang Plank
Iron Chieftain in the Singapore shipyards. The existing handrail was already collapsible but required 2 to 3 men to manually wrestle it up and down while overhanging the edge of the ship 20 metres above the dock or open ocean. We left 99% of the existing handrail in place and modified it for pneumatic operation